The Daily Pennsylvanian is a student-run nonprofit.

Please support us by disabling your ad blocker on our site.

The University Data Center experienced “an excessive heat condition” on Tuesday afternoon, according to Jeff Ballentine, a staff member of Information Systems and Computing’s Provider Desk.

The 15-minute malfunction caused the necessary shut-down of “the University’s financial, research and student online services,” according to a statement issued by the Provider Desk.

An accidental switch of one of two glycol pumps — which serve to cool the Data Center — from manual to automatic during an equipment replacement resulted in overheating. Consequently, the equipment shut down, according to the statement.

The ISC Provider Desk released an e-mail to inform those affected by the equipment failure of the occurrence and its subsequent repair.

Comments powered by Disqus

Please note All comments are eligible for publication in The Daily Pennsylvanian.